MULTATECH completed construction documents for City of Fort Worth Timberland Boulevard and Park Vista Boulevard, both 4-lane arterials.

Project Highlights:


Phase I:

  • Roadway extensions (4-lane arterials) and a two-lane roundabout
  • Water line extensions/adjustments, storm water and sewer design
  • Shared bike path and sidewalks with latest ADA standards

Phase II:

  • 2-lane rural section to 5-lane arterial roadway curb and gutter
  • Storm water and storm sewer design
  • Shared bike path and sidewalks with latest ADA standards

Phase III:

  • Roadway extensions (4-lane arterials)
  • Storm water design
  • Intersection design
  • Railroad quiet zone design (UPRR) railroad permitting