MULTATECH completed construction documents for City of Fort Worth Timberland Boulevard and Park Vista Boulevard, both 4-lane arterials.
Project Highlights:
Phase I:
- Roadway extensions (4-lane arterials) and a two-lane roundabout
- Water line extensions/adjustments, storm water and sewer design
- Shared bike path and sidewalks with latest ADA standards
Phase II:
- 2-lane rural section to 5-lane arterial roadway curb and gutter
- Storm water and storm sewer design
- Shared bike path and sidewalks with latest ADA standards
Phase III:
- Roadway extensions (4-lane arterials)
- Storm water design
- Intersection design
- Railroad quiet zone design (UPRR) railroad permitting